Pine Valleys Water Supply Scheme (WSS)


Announced Allocations

The Pine Valleys Water Supply Scheme is running with the following announced allocations:
 
High Priority A
Last updated: 1 July 2010
100%

Parameters used in Calculating Announced Allocations

Formula for High Priority A Water Allocations
  • 100% when the level in North Pine Dam is greater than EL 29.3m AHD
  • When the water level in North Pine Dam is equal to or less than EL 29.3m AHD the High Priority A Announced Allocation must be calculated using the following formula as set out in s101 of the Moreton Resource Operations Plan:
 
AAHPA = ((UV+DIVHPA)/HPAA) x 100
 
Parameters for AA High calculation
 
The following parameters were used in calculating the current AA High:
 
UV (Useable Volume) 168199ML
DIVHPA (High Priority Diversion) 0ML
HPAA (High Priority A Water Allocations) 59000ML
 
 
Pine Valleys Scheme Region