Approximately three metres higher than the existing weir bridge, and with a combination steel and concrete guardrail design to better withstand flooding, the new bridge provides a more flood-resilient route and will deliver improved traffic flow over the Brisbane River in Mount Crosby.
More information is available in this Ministerial Media Statement