Corporate publications
We produce a range of publications to provide the community and stakeholders with information about our operations and activities.
Our corporate plans and reports
Seqwater Strategic Plan 2024-28
Sets out our strategic direction, purpose and key priorities.
Seqwater Operational Plan 2023-24
The performance agreement between us and our responsible Ministers that sets our financial and non-financial performance targets for the year.
Seqwater Annual Report 2023-24
Annual performance report against targets set out in the operational plan for the financial year.
Corporate Governance Statement 2023-24
This statement is to be read in conjunction with Seqwater's Annual Report and explains how Seqwater complies with the expectations for statutory authorities as set out in the Corporate Governance Guidelines for Government Owned Corporations, Version 2.0 (Queensland Treasury: February 2009).
The materials presented on this site are provided by the Queensland Government for information purposes only. Users should note that the electronic versions of the annual report, including the financial statements, on this site are not recognised as the official or authorised version. The electronic versions are provided solely on the basis that users will take responsibility for verifying their accuracy, completeness and currency. Although considerable resources are used to prepare and maintain the electronic versions, the Queensland Government accepts no liability for any loss or damage that may be incurred by any person acting in reliance on the electronic versions. The official copy of the annual report, as tabled in the Legislative Assembly of Queensland can be accessed from the Queensland Parliament’s tabled papers website database: Link to Online Tabled Papers | Queensland Government All content in the printed (tabled) annual report is available online.
Water Security Program 2023
Our blueprint for managing water over the next 30 years, within the guidelines set by the Department of Natural Resources, Mines and Energy. For more information, click here.
Queensland Bulk Water Supply Authority Performance Report 2021-22
Our annual report on the performance reporting framework against key performance indicators (KPIs), as per the Water Supply (Safety and Reliability) Act 2008.
Policy statements
Our policy statements outline our commitment to the areas of:
Operational plans and reports
South East Queensland (SEQ) Bulk Water Supply Code
Administered by Department of Energy and Water Supply, regulates the supply of bulk services such as the supply of water and water services, between Code-regulated Entities (e.g. Council and council-owned service providers).
Volume Calculation Methodology (VCM)
The VCM is used to calculate the cost of providing a Bulk Service to an un-metered Bulk Supply Point. The VCM may be reviewed if requested by a Code-regulated Entity and Seqwater will undertake consultation with affected Code-regulated entities prior to making any amendment to the VCM.
Technical Standard Specification - Supply and installation bulk supply meters for potable water
This standard specification provides the minimum requirements for Seqwater work relation to the design, supply and installation of bulk supply (revenue) meters for potable water. It does not apply to meters used for non-revenue applications.
Flood manuals and emergency plans
Manual of Operational Procedures for Flood Mitigation at North Pine Dam Revision 12 (December 2023)
25 February - 9 March 2022 flood event reports
Emergency Action Plans for Referable Dams
We have an approved action plan for each of our referable dams. You can download them from the Business Queensland website.
Drinking Water Service Annual Report 2022-2023 (final)
Enclosure 1a - Verification monitoring 2022-2023 Water Quality data report
Enclosure 1b - Verification monitoring 2022-2023 Water Quality data from offline SEQ Water Grid sampling points
Enclosure 2a - Winter 2022 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
Enclosure 2b - Summer 2023 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP) Current 30 June 2023
Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures
Past reports
Drinking Water Quality Management Plan Annual Report 2021-2022
Enclosure 1 Verification monitoring 2021-2022 Water Quality data report
Enclosure 2a Report Winter 2021 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program Passive Sampling
Enclosure 2b Report Summer 2022 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program Passive Sampling
Enclosure 3 Drinking Water Quality Improvement Plan (DWQIP)
Enclosure 4 Register of changes to DWQMP, HACCP plans and procedures
Drinking Water Quality Management Plan (DWQMP) Annual Report 2020-21
Drinking Water Quality Management Plan (DWQMP) Annual Report 2019-20
- Enclosure 1 - 2019-20 water quality data report
- Enclosure 2a - Catchment and water quality micro pollutant monitoring program - passive sampling Winter 2019 report
- Enclosure 2b - Catchment and water quality micro pollutant monitoring program - passive sampling Summer 2020 report
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP)
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures
- Enclosure 5 - Register of audit of Seqwater DWQMP for WSR 2020
Drinking Water Quality Management Plan (DWQMP) Annual Report 2018-19
- Enclosure 1 - Verification monitoring 2018-19
- Enclosure 2a - 2018 Winter Catchment and Drinking Water Quality Micropollutant Monitoring Program - Passive Sampling
- Enclosure 2b - 2019 Summer Catchment and Drinking Water Quality Micropollutant Monitoring Program - Passive Sampling
- Enclosure 3 - Drinking Water Quality Improvement Plan
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures.
Western Corridor Recycled Water Scheme (WCRWS) Recycled Water Management Plan (RWMP) Annual Report 2022-23
Enclosure 1 Luggage Point AWTP Source Water Data water quality report 2022-2023
Enclosure 2a Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2022-2023
Enclosure 2b Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2022-2023
Enclosure 3 Reporting of regular audit in Recycled Water Management Plan Annual Report 2021-2022
Past reports
Western Corridor Recycled Water Scheme (WCRWS) Management Plan Annual Report 2021-22
Enclosure 1 - Luggage Point AWTP Source Water data water quality report 2021-22
Enclosure 2a - Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2021-22
Enclosure 2b - Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2021-22
Enclosure 3 - Luggage Point AWTP and Lake Wivenhoe Points of Supply incidents for noncompliance with water quality criteria: failure to test or missing data 2021-22
Western Corridor Recycled Water Scheme Annual Report 2020-21
Western Corridor Recycled Water Scheme Annual Report 2019-20
Western Corridor Recycled Water Scheme RWMP Annual Report 2018-19
Western Corridor Recycled Water Scheme Annual Report 2017-18
Wyaralong Dam Estuarine Ecological Management Plan Annual Report
In accordance with the Environmental Protection and Biodiversity Conservation approval for operation of the Wyaralong Dam (ref: 2006/3157), Seqwater is required to publish the annual report for the Wyaralong Dam Estuarine Ecological Management Plan (EEMP). The report documents as a review of the monitoring data collected in 2012. Based on the indicators assessed in 2011 and 2012, no detrimental changes in physical, chemical or ecological conditions in the Logan River estuary or southern Moreton Bay were attributable to the Wyaralong Dam construction or operation.
Banksia Beach - Borefield Environmental Management Plan
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act (1999), for the Bribie Island Water Treatment Plant and Borefield, Seqwater is required to publish the Borefield Environmental Management Plan.
Banksia Beach Borefield - Annual Compliance Report 2022-23
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the eighth compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2022 and 31 August 2023.
Banksia Beach Borefield - Annual Compliance Report 2021-22
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the eighth compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2021 and 31 August 2022.
Bribie Island Borefield - Annual Compliance Report 2018-19
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the fifth compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2018 and 31 August 2019.
Bribie Island Borefield - Annual Compliance Report 2017-18
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the fourth compliance report on the operation and management of the Basnkia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2017 and 31 August 2018.
Bribie Island Borefield Annual Compliance Report 2016-17
Part A [2MB] | Part B [2MB] | Part 3 [MB] | Part 4 [2MB] | Part 5 [2MB] | Part 6 [2MB]
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the third compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addresses compliance with the conditions of approval between the 1 September 2016 and 31 August 2017.
Northern Pipeline Interconnector Stage 2 Annual Compliance Report 2023-24
This annual compliance report is the 14th compliance report on Matters of National Environmental Significance (MNES) for the Northern Pipeline Interconnector Stage 2 (NPI Stage 2) and addresses the requirements of conditions applied to the project under the Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act).